211' JET A1 TANK | MIDSTREAM TERMINAL
A large fuel terminal in Guam required an online API 653 inspection of a 211-foot diameter jet fuel tank, combined with a full tank calibration survey. The terminal's critical operational role meant that any downtime would have far-reaching consequences.
Case Studies
150' DIESEL TANK | MIDSTREAM TERMINAL
A major midstream terminal operator had a 150-foot DOT diesel storage tank that the terminal said would require 7 months for a conventional out-of-service inspection. The operator sought to eliminate months of downtime and hundreds of thousands of dollars in cleaning and mobilization costs by utilizing robotic inspection technology.
Case Studies
118' DIESEL TANK | MIDSTREAM TERMINAL — MOZAMBIQUE
A fuel storage terminal in Mozambique required an inspection of their primary diesel storage tank. The terminal's remote location meant that taking the tank out of service would have created severe logistical and supply chain disruptions, with impacts far beyond the facility itself.
Case Studies
120' NAPHTHA TANK | MIDSTREAM TERMINAL — SIDE LAUNCH
A major terminal operator did not want to drain product below the manway level to install the manway adapter and valve required for a standard side launch inspection — but still needed an onstream API 653 inspection completed. The site worked with Square Robot to complete installation through a different avenue.
Case Studies
120' GASOLINE TANK | MIDSTREAM TERMINAL — SIDE LAUNCH
A terminal operator had a critical 120-foot gasoline tank with an internal fiberglass liner that could not be taken offline for extended periods. Inspection was needed by year-end, and the fiberglass liner created a unique technical challenge: conventional UT would not penetrate the coating.